logo

Reused Construction Beam Wall Modular Aluminum Alloy Concrete Formwork

FREE SHIPPING

Offer price breaks when you order a larger quantify.

Leading time would be depends on our work efficiency and delivery schedule, usually within 2 business days.

Shipping: Ships in 2 business day

Workstation

The tool workbench is made of aluminum profiles as raw materials, using a variety of aluminum profiles, cutting precision, It is easy to process, and the surface is not rusty. It can be combined with various materials and accessories to assemble into various Various styles of workbenches are beautiful and portable, easy to disassemble and assemble, flexible to adjust, and can be customized on demand.

It does not require maintenance and is widely used in various industrial production industries.


safety & guarding

Aluminum profile small shield Product classification: Industrial fence/protection case The whole is made of aluminum profile 4040 and frosted pc board. The overall appearance is beautiful and atmospheric, relatively stable, and the size can be customized according to requirements


Machine Enclosure Machine Frame

The automobile inspection fixture frame is assembled with aluminum profiles and accessories, and the product is designed according to customer requirements Appropriate frame structure, using heavy-duty profiles and supporting connectors, beautiful products , Atmosphere, high strength, please consult APS online customer service for details


Aluminum formwork, Aluminum formwork direct from Shandong

Optimised for the construction of solid or lightened slabs with excellent concrete recoverable modular aluminium formwork $100.00 . $150.00 / Square Meter 100.0 Square Meters (Min. Order)

HI-LITE: The Leader in Aluminum Shoring & Forming

Aluminum is the leading edge material in concrete forming and shoring products. HI-LITE is “INNOVATION”. In 1974, HI-LITE designed the first aluminum shoring system, thereby capturing the allegiance of project managers in North America and Europe.

Best Quality Aluminum Formwork System For

Aluminium Formwork System is a construction system for forming cast in place concrete structure of a building; It is also a system for scheduling and controlling the work of other construction trades such as steel reinforcement- concrete placement- and mechanical and electrical conduits;

Formwork | Commercial Metals

MevaLite Formwork system is a modular, handset clamp system that offers con|tractors a high|tech, low|weight solution for greater flexibility and cost savings.The economic advantages are evident in areas that are conventionally formed using traditional timber and plywood such as strip footings, foundation slabs, light shafts, various beams, landings and drain shafts.

What Is Aluminum Formwork? - Aluminium Extrusion

Aluminum alloy building formwork is also easy to assemble by hand into pieces and then hoisted by mechanical as a whole! and is applied to wall formwork! horizontal floor slabs! columns! beams! climbing forms! and other templates. What’s more! it has a high residual value and obvious cost advantage.

TECON Modular Formwork System, Modular Shuttering For

TECON Modular Formwork mainly consists of AluLITE Formwork: Steel LITE Formwork and Plastic Formwork TP60+. For any villa project: low cost housing project: especially with hundreds of or thousands of houses at same plan and size: modular formwork can maximize the site productivity and save labor cost greatly.

Aluminium Modular Formwork CC-4 - ULMA

The CC|4 is a recoverable modular aluminium formwork optimised for the construction of solid or lightened slabs with excellent concrete finishes, With an aluminium structure and a fast and effective stripping system, it is designed to obtain reductions in assembly and dismantling times with high safety standards guaranteed for the worker, It also permits two types of assembly· with panel (aluminium frame with integrated board) or phenolic plywood,

Aluminium Formwork – Designed for Green, Efficient Building

Finished by high bearing capacity, good stability, easy to install and reuse, aluminium formwork system can ensure that the single-layer construction cycle is controlled within 4–5 days· This new generation green formwork technology can forms all kinds of concrete in a building, such as walls, columns, floor slabs, beams, stairs, window hoods ···

Why Aluminum Formwork |

With an average turnover period of 4 days/ floor, aluminium formwork can improve productivity significantly and save site cost. High Reusability Within its lifespan, the aluminium formwork can be reused over 300 times, which will save 30% budget in total, compared with timber formwork and steel formwork.